黑人一区二区 I 污黄网站在线观看 I 影音先锋va I 在线免费色视频 I 国产老头和老头xxxx× I 色综久久 I 欧美三级 欧美一级 I 日本色电影 I 狼人久草 I 大黑人交xxx极品hd I 啊灬快c我灬啊灬用力灬啊灬 I 97干在线 I 天堂视频免费看 I 国产极品美女高潮无套嗷嗷叫酒店 I 欧美尻逼 I 中文有码在线 I 贝利弗山的秘密在线观看 I 国产97在线 | 亚洲 I 亚洲三级理论 I 免费的av网站 I 亚洲又粗又长 I 黄色shi I 久久精品国产精品亚洲红杏 I 亚洲在线www I 成人动漫在线一区 I 美腿一区 I 先锋资源站av I 久久久久免费网 I 99爱国产精品 I 99精品国产一区二区电影 I 日本国产欧美在线n677.cc I 国产男女色诱视频在线播放 I 免费国产va在线观看 I 国产农村黄aaaaa特黄av毛片 I 国产极品模特精品一二 I 免费毛片黄片 I 色戒在线免费观看 I 日日鲁鲁 I 中文字幕无码乱人妻

Welcome to visit Hnchairman Industrial Intelligent System Official website!

Cases

position:Home > Cases

Coke oven heating intelligent control system

Release date:2020-01-08 Source:This site Views:3106
  I. Project introduction and construction

  The intelligent control system of coke oven heating is designed for the 5.5m stamp charging coke oven. The system aims to save gas, stabilize coke quality and facilitate manual operation. Through intelligent control of coke oven heating process and coordination of four car interlocking system, the coking production process is comprehensively and intelligently controlled.

  The scope of the project includes the production site of the coke oven, from the main body of the coke oven to fixed facilities such as gas pipelines, flues, risers, and smoke separation ducts, as well as four vehicles (coal loading vehicles, coke pushing vehicles, coke quenching vehicles, coke blocking vehicles), Mechanical facilities such as switches. The manageable objects include the main body of the coke oven and various gas pipes, flues, and four-car equipment; the materials include heating gas, air, coke cake, exhaust gas, and waste gas.

  uilding progress:

  Hunan Qianmeng Industrial Intelligent System Co., Ltd. has signed the contract on May 3, 2018 and completed the acceptance on October 6, 2018.

  Second, the implementation plan

 The project is divided into various sub-systems for implementation, including the stand-fire flame temperature measurement system, the riser temperature measurement system, the gas single-pipe automatic transformation system, and the four-car interlocking system implementation plan

  1.Construction of temperature measurement system for vertical fire tunnel


Figure 21 Overall layout of full and semi-installed infrared temperature measurement in vertical fire tunnel

  The installation of 1 # furnace infrared thermometer in the figure above is a schematic diagram of the full installation of the thermometer. There are 4 control cabinets on the coke side and the machine side of the furnace end table and the furnace table. There are 102 temperature measurement points in each furnace. (For example, 51 thermometers on the focal side, "machine control cabinet 1" is connected to nearly 26, and "machine control cabinet 3" is close to 25, and the machine side is similar). At the same time, the air source or nitrogen source is connected to the furnace table and the end table. The air source needs to be equipped with 2 sets of air filters on the coke side, a total of 4 sets of air filters. The air source and nitrogen source can be automatically switched. Backside infrared thermometer.

  The backflushing gas is mainly nitrogen, and clean and dry instrument wind is used as a backup. Manual remote switching is implemented according to the needs of the site to ensure that the backflushing system has continuous wind.

  The DN50 gas pipe interface needs to be connected near the coke oven, with a flanged stop valve, and an air storage tank location (1000mm in diameter and 2500mm in height) is reserved. Air source pressure is not less than 0.8Mpa. The air volume is about 40m3 / h.

  (1) Partial installation drawing
Figure 22 Installation layout of the infrared thermometer in the fire tunnel

  (2) Site construction drawing

  Host computer interface

  Figure 23 Average temperature, change trend, and statistical table

  Hardware physical map
Figure 24 Demonstration diagram of temperature measurement point installation
Figure 25 Demonstration diagram of infrared thermometer fiber
Figure 26 Infrared thermometer control cabinet

  2. Construction of temperature measurement system for riser

  1) Overall installation layout
Figure 27 Overall layout of riser thermocouple installation

  The machine control cabinet is arranged in the furnace room to connect all thermocouples; the machine control cabinet is connected to the central control cabinet of the central control room through the DP bus.

  2) Partial installation drawing

  Installed near the bridge pipe connection, the temperature of the waste gas is lower than that of the riser pipe, which can prolong the life of the thermocouple, save materials and facilitate installation.
Figure 28 Schematic diagram of the thermocouple component mounting part (near the bridge tube connection)

  3) Site construction drawing

  ? Host computer interface
Figure 29 Trend of crude gas temperature with coking time

  Site physical map
Figure 30 Demonstration point 2—Bridge tube

  3.Automated reconstruction of single gas pipe

  1) Overall installation layout
Figure 33 Overall installation layout of coke oven gas single tube reconstruction

  2) Reconstruction diagram

  There is a short joint between the single tube orifice plate box and the addition and subtraction of the Cork for transformation. The workload is small, and the existing single tube structure will not be changed.

  The control center sends a signal to the positioner, the positioner works to connect the air source, and the opening degree of the butterfly valve is adjusted to a suitable position by a pneumatic actuator (if there is no air source and no electricity, the manual mechanism can be adjusted manually To adjust the butterfly valve opening). When the opening degree of the butterfly valve is adjusted to the specified position, the positioner cuts off the power and keeps the butterfly valve in this position. Then the signal is transmitted to the control center, so as to realize the automatic adjustment of the single tube.

  The modified sealing device is also a sealing device using the existing pipeline.

Fig. 32 Schematic diagram of coke oven gas single tube transformation-(short section modification)


Figure 33 Structure of the regulating valve


Figure 34 Overall bird's eye view

  The position of the bridge can be in the upper or lower part, the specific position is subject to the scene.
Figure 34 Pneumatic actuator pneumatic circuit diagram

  The gas path is arranged such that the center of the furnace body is divided into two gas path headers, and then a pneumatic regulating butterfly valve connected to each single tube through a pipe joint and a gas tube.

  2) Site construction drawings

  Host computer interface
Figure 34 single tube optimization control interface

  The interface includes a single hole fire fall time abnormal prompt, an oven time reminder, a vertical fire tunnel temperature abnormal prompt, a single tube adjustment automatic means switch, and exchange signal display.

  ? Hardware physical map

  Figure a before transformation Figure b after transformation
Figure 35 Site effect diagram of single tube reconstruction-(short section reconstruction)

  4.Four-car interlocking system

  Host computer interface

Figure 31 Real-time monitoring diagram of four-vehicle interlocking system


Figure 32 Focusing plan

  The four-car interlocking system can provide coke oven coke push and coal loading data for coke oven heating. The coke oven heating system analyzes coke oven time and adjusts the demand for coke oven gas. The stroke of the coke rod is conducive to the temperature measurement of the coke cake to determine the temperature of each position of the coke cake. The temperature of the coke cake is helpful to deduce the corresponding heating situation of the vertical fire tunnel. The system can be upgraded to increase the unit of coke pusher and coke quencher, which is convenient for the management of coke oven production.

 Third, the technical route

  The system includes a data acquisition subsystem, a gas supervisor automatic adjustment subsystem, a flue gas suction automatic adjustment subsystem, a gas collection process intelligent control subsystem, and a four-car interlocking subsystem. The system framework is shown in the figure:
Figure 1 system structure diagram

  The system uses industrial network environmental protection detection system, laboratory system, dcs system and other third-party systems in the factory for data exchange; and installs online collection equipment data, mainly including straight-line temperature, flue gas exhaust gas oxygen content zirconia, rising tube Gas temperature, opening degree of single pipe control valve, etc.

  After the intelligent calculation center comprehensively analyzes the data, it intelligently adjusts the set value of the gas main, the set value of the suction of the flue gas, the opening degree of the single-pipe regulating valve, and optimizes the standard temperature to ensure stable and uniform temperature in the coking process. The intelligent computing center communicates with the DCS system to achieve data sharing and bumpless switching.

  4. Project achievements, implementation results and experience summary

  Project achievements and implementation results

  After the project is put into use, it meets environmental protection production, and the workload of temperature regulation and temperature measurement is significantly reduced, and the gas saving effect is obvious. The specific effects are as follows:

  1. Under the condition of the same gas calorific value, standard temperature and coal blending level, the gas can be saved by about 5% through the main pipe control.

  2. Under normal production conditions such as no clogging of the coke oven gas pipeline, stable gas flow meter, normal regulating valve, and sufficient gas pressure, the average temperature of the whole furnace is ± 7 ° C.

  3. Reduce nitrogen oxides by about 30% under normal operating conditions.

  Lessons learned:

  Coking intelligent manufacturing projects, based on automated equipment, add the necessary online sensing, and through working condition analysis and pre-judgment, the focus is on adaptive control to meet on-site working condition changes, and automatic accumulation of knowledge base to achieve coking production. Intelligence and management intelligence.
0730-8206860
主站蜘蛛池模板: 欧美精品欧美极品欧美激情 | 日日夜夜噜噜 | 久久精品高清一区二区三区 | 亚洲影院天堂中文av色 | 久久se精品一区精品二区 | 欧美一区二区不卡视频 | 亚洲性夜夜天天天 | 国产亚洲精品久久久久久彩霞 | 久久综合国产精品 | 色播影院性播影院私人影院 | 亚洲天堂自拍偷拍 | 99久久无色码中文字幕人妻蜜柚 | 亚洲欧洲国产成人综合在线观看 | 三级特黄特色视频 | 久久久久国产精品 | 亚洲电影在线观看 | 青草视频在线看 | 凹凸日日摸日日碰夜夜 | 日本免费观看视频 | 国产精品高潮呻吟av久久黄 | 国产成人无码一区二区三区 | 丰满少妇大力进入av亚洲葵司 | 亚洲一卡二卡三卡 | 久久精品在线观看 | 色小说亚洲 | 九九热视频在线免费观看 | 欧美xxxx欧美精品 | 亚洲成国产人片在线观看 | 久久国产一区二区三区 | 欧美日韩一本无线码专区 | 熟妇人妻无码xxx视频 | 国产又粗又猛又爽又黄的 | 中文字幕人妻被公上司喝醉在线 | 四虎国产视频 | 国产欧亚州美日韩综合区 | 欧美色偷偷 | 精品日产高清卡4卡5区别 | 久久大香香蕉国产 | 纯爱无遮挡h肉动漫在线播放 | 国产又粗又长又大 | 粗大猛地挺进娇喘啊在线视频 | 久久久人成影片免费观看 | 九九涩 | 中文字幕在线导航 | 91综合激情 | 国产二区一区 | 人人爽天天碰天天躁夜夜躁 | 国产成年无码久久久免费 | 欧美午夜久久 | 少妇真实自偷自拍视频6 | 免费人妻无码不卡中文字幕18禁 | 人妻无码一区二区三区免费 | 超碰综合 | 日本免费人成在线观看网站 | 青青视频二区 | 精品国产乱码久久久久久虫虫 | av中文字幕潮喷人妻系列 | 国产又粗又猛又大爽又黄香借 | 久久久av片 | 欧美人与性禽动交情品 | 99麻豆久久久国产精品免费 | 中文字幕丝袜精品久久 | 国产黄色大片免费看 | 2012中文字幕在线视频 | 九九九九九九精品任你躁 | 国产精品网站在线观看免费传媒 | 久久亚洲黄色 | 亚洲区中文字幕 | 东方av在线免费观看 | 精69xxxⅹxx喷潮 | 少妇久久久久久人妻无码 | 麻豆91精品91久久久的优点 | 亚洲精品无码中文久久字幕 | 波多野结衣天堂 | 亚洲九一 | 婷婷伊人五月尤物 | 国产精品无打码在线播放 | 丰满少妇被猛烈进入 | 又湿又紧又大又爽a视频 | 4438ⅹ亚洲全国最大色丁香 | 国产亚洲高初学生不卡观看 | 精品无码人妻夜人多侵犯18 | 欧洲妇女成人淫片aaa视频 | 国产成年人 | 国产女爽爽精品视频天美传媒 | 香蕉av久久一区二区三区 | 亚洲日韩在线a视频在线观看 | a级片一级片 | 国产精口品美女乱子伦高潮 | 亚洲高清专区日韩精品 | 奇米二区 | 九色porny丨首页在线 | 日本人与黑人做爰视频网站 | 91精品久久久久久蜜桃 | 亚洲视频在线观看网站 | 精品一区二区三区四区 | www.8888久久爱站网 | 99久久久无码国产精品性 | 国产乱肉妇乱免费 |