黑人一区二区 I 污黄网站在线观看 I 影音先锋va I 在线免费色视频 I 国产老头和老头xxxx× I 色综久久 I 欧美三级 欧美一级 I 日本色电影 I 狼人久草 I 大黑人交xxx极品hd I 啊灬快c我灬啊灬用力灬啊灬 I 97干在线 I 天堂视频免费看 I 国产极品美女高潮无套嗷嗷叫酒店 I 欧美尻逼 I 中文有码在线 I 贝利弗山的秘密在线观看 I 国产97在线 | 亚洲 I 亚洲三级理论 I 免费的av网站 I 亚洲又粗又长 I 黄色shi I 久久精品国产精品亚洲红杏 I 亚洲在线www I 成人动漫在线一区 I 美腿一区 I 先锋资源站av I 久久久久免费网 I 99爱国产精品 I 99精品国产一区二区电影 I 日本国产欧美在线n677.cc I 国产男女色诱视频在线播放 I 免费国产va在线观看 I 国产农村黄aaaaa特黄av毛片 I 国产极品模特精品一二 I 免费毛片黄片 I 色戒在线免费观看 I 日日鲁鲁 I 中文字幕无码乱人妻

Welcome to visit Hnchairman Industrial Intelligent System Official website!

Cases

position:Home > Cases

Coke oven heating intelligent control system

Release date:2020-01-08 Source:This site Views:3335
  I. Project introduction and construction

  The intelligent control system of coke oven heating is designed for the 5.5m stamp charging coke oven. The system aims to save gas, stabilize coke quality and facilitate manual operation. Through intelligent control of coke oven heating process and coordination of four car interlocking system, the coking production process is comprehensively and intelligently controlled.

  The scope of the project includes the production site of the coke oven, from the main body of the coke oven to fixed facilities such as gas pipelines, flues, risers, and smoke separation ducts, as well as four vehicles (coal loading vehicles, coke pushing vehicles, coke quenching vehicles, coke blocking vehicles), Mechanical facilities such as switches. The manageable objects include the main body of the coke oven and various gas pipes, flues, and four-car equipment; the materials include heating gas, air, coke cake, exhaust gas, and waste gas.

  uilding progress:

  Hunan Qianmeng Industrial Intelligent System Co., Ltd. has signed the contract on May 3, 2018 and completed the acceptance on October 6, 2018.

  Second, the implementation plan

 The project is divided into various sub-systems for implementation, including the stand-fire flame temperature measurement system, the riser temperature measurement system, the gas single-pipe automatic transformation system, and the four-car interlocking system implementation plan

  1.Construction of temperature measurement system for vertical fire tunnel


Figure 21 Overall layout of full and semi-installed infrared temperature measurement in vertical fire tunnel

  The installation of 1 # furnace infrared thermometer in the figure above is a schematic diagram of the full installation of the thermometer. There are 4 control cabinets on the coke side and the machine side of the furnace end table and the furnace table. There are 102 temperature measurement points in each furnace. (For example, 51 thermometers on the focal side, "machine control cabinet 1" is connected to nearly 26, and "machine control cabinet 3" is close to 25, and the machine side is similar). At the same time, the air source or nitrogen source is connected to the furnace table and the end table. The air source needs to be equipped with 2 sets of air filters on the coke side, a total of 4 sets of air filters. The air source and nitrogen source can be automatically switched. Backside infrared thermometer.

  The backflushing gas is mainly nitrogen, and clean and dry instrument wind is used as a backup. Manual remote switching is implemented according to the needs of the site to ensure that the backflushing system has continuous wind.

  The DN50 gas pipe interface needs to be connected near the coke oven, with a flanged stop valve, and an air storage tank location (1000mm in diameter and 2500mm in height) is reserved. Air source pressure is not less than 0.8Mpa. The air volume is about 40m3 / h.

  (1) Partial installation drawing
Figure 22 Installation layout of the infrared thermometer in the fire tunnel

  (2) Site construction drawing

  Host computer interface

  Figure 23 Average temperature, change trend, and statistical table

  Hardware physical map
Figure 24 Demonstration diagram of temperature measurement point installation
Figure 25 Demonstration diagram of infrared thermometer fiber
Figure 26 Infrared thermometer control cabinet

  2. Construction of temperature measurement system for riser

  1) Overall installation layout
Figure 27 Overall layout of riser thermocouple installation

  The machine control cabinet is arranged in the furnace room to connect all thermocouples; the machine control cabinet is connected to the central control cabinet of the central control room through the DP bus.

  2) Partial installation drawing

  Installed near the bridge pipe connection, the temperature of the waste gas is lower than that of the riser pipe, which can prolong the life of the thermocouple, save materials and facilitate installation.
Figure 28 Schematic diagram of the thermocouple component mounting part (near the bridge tube connection)

  3) Site construction drawing

  ? Host computer interface
Figure 29 Trend of crude gas temperature with coking time

  Site physical map
Figure 30 Demonstration point 2—Bridge tube

  3.Automated reconstruction of single gas pipe

  1) Overall installation layout
Figure 33 Overall installation layout of coke oven gas single tube reconstruction

  2) Reconstruction diagram

  There is a short joint between the single tube orifice plate box and the addition and subtraction of the Cork for transformation. The workload is small, and the existing single tube structure will not be changed.

  The control center sends a signal to the positioner, the positioner works to connect the air source, and the opening degree of the butterfly valve is adjusted to a suitable position by a pneumatic actuator (if there is no air source and no electricity, the manual mechanism can be adjusted manually To adjust the butterfly valve opening). When the opening degree of the butterfly valve is adjusted to the specified position, the positioner cuts off the power and keeps the butterfly valve in this position. Then the signal is transmitted to the control center, so as to realize the automatic adjustment of the single tube.

  The modified sealing device is also a sealing device using the existing pipeline.

Fig. 32 Schematic diagram of coke oven gas single tube transformation-(short section modification)


Figure 33 Structure of the regulating valve


Figure 34 Overall bird's eye view

  The position of the bridge can be in the upper or lower part, the specific position is subject to the scene.
Figure 34 Pneumatic actuator pneumatic circuit diagram

  The gas path is arranged such that the center of the furnace body is divided into two gas path headers, and then a pneumatic regulating butterfly valve connected to each single tube through a pipe joint and a gas tube.

  2) Site construction drawings

  Host computer interface
Figure 34 single tube optimization control interface

  The interface includes a single hole fire fall time abnormal prompt, an oven time reminder, a vertical fire tunnel temperature abnormal prompt, a single tube adjustment automatic means switch, and exchange signal display.

  ? Hardware physical map

  Figure a before transformation Figure b after transformation
Figure 35 Site effect diagram of single tube reconstruction-(short section reconstruction)

  4.Four-car interlocking system

  Host computer interface

Figure 31 Real-time monitoring diagram of four-vehicle interlocking system


Figure 32 Focusing plan

  The four-car interlocking system can provide coke oven coke push and coal loading data for coke oven heating. The coke oven heating system analyzes coke oven time and adjusts the demand for coke oven gas. The stroke of the coke rod is conducive to the temperature measurement of the coke cake to determine the temperature of each position of the coke cake. The temperature of the coke cake is helpful to deduce the corresponding heating situation of the vertical fire tunnel. The system can be upgraded to increase the unit of coke pusher and coke quencher, which is convenient for the management of coke oven production.

 Third, the technical route

  The system includes a data acquisition subsystem, a gas supervisor automatic adjustment subsystem, a flue gas suction automatic adjustment subsystem, a gas collection process intelligent control subsystem, and a four-car interlocking subsystem. The system framework is shown in the figure:
Figure 1 system structure diagram

  The system uses industrial network environmental protection detection system, laboratory system, dcs system and other third-party systems in the factory for data exchange; and installs online collection equipment data, mainly including straight-line temperature, flue gas exhaust gas oxygen content zirconia, rising tube Gas temperature, opening degree of single pipe control valve, etc.

  After the intelligent calculation center comprehensively analyzes the data, it intelligently adjusts the set value of the gas main, the set value of the suction of the flue gas, the opening degree of the single-pipe regulating valve, and optimizes the standard temperature to ensure stable and uniform temperature in the coking process. The intelligent computing center communicates with the DCS system to achieve data sharing and bumpless switching.

  4. Project achievements, implementation results and experience summary

  Project achievements and implementation results

  After the project is put into use, it meets environmental protection production, and the workload of temperature regulation and temperature measurement is significantly reduced, and the gas saving effect is obvious. The specific effects are as follows:

  1. Under the condition of the same gas calorific value, standard temperature and coal blending level, the gas can be saved by about 5% through the main pipe control.

  2. Under normal production conditions such as no clogging of the coke oven gas pipeline, stable gas flow meter, normal regulating valve, and sufficient gas pressure, the average temperature of the whole furnace is ± 7 ° C.

  3. Reduce nitrogen oxides by about 30% under normal operating conditions.

  Lessons learned:

  Coking intelligent manufacturing projects, based on automated equipment, add the necessary online sensing, and through working condition analysis and pre-judgment, the focus is on adaptive control to meet on-site working condition changes, and automatic accumulation of knowledge base to achieve coking production. Intelligence and management intelligence.
0730-8206860
主站蜘蛛池模板: 国产性一交一伦一色一情 | 男ji大巴进入女人的视频小说 | 麻豆一区二区三区蜜桃免费 | 免费中文字幕在线观看 | 国产chinasex对白videos麻豆 | 一级黄色香蕉视频 | 国产最新精品视频 | 日韩a人毛片精品无人区乱码 | 2019国产精品青青草原 | 亚洲成 人 综合 亚洲欧洲 | 国产亚洲精品影视在线 | 亚洲精品综合一区二区 | 伊人网在线观看 | 自拍视频啪 | 国内精品人妻无码久久久影院导航 | 下面一进一出好爽视频 | 国产一级片a | 国产精品一品二区三区四区18 | 日韩人妻无码精品免费shipin | 亚洲国产日韩精品二三四区91 | 可以直接看的毛片 | 精品麻豆一卡2卡三卡4卡乱码 | 黄色在线免费观看网站 | 97无码精品综合 | 国产美女亚洲精品久久久综合 | 成人资源在线 | 四虎国产精品永久免费网址 | 极品少妇被猛得白浆直喷白浆小说 | 日本熟妇中文字幕三级 | 国产婷婷久久 | 野花久久| 欧美中文字幕无线码视频 | 国产精品7777777| 漂亮人妻被中出中文字幕 | 亚洲欧美日韩国产 | 日本xxxx肉体谢液体色液体 | 1024手机在线观看 | 国产日韩欧美成人 | 国产精品亚洲片在线播放 | 91蝌蚪视频在线观看 | 久久se精品一区二区 | 变态拳头交视频一区二区 | 国产福利免费在线观看 | 又大又黄又爽视频一区二区 | 手机免费看毛片 | 亚洲乱码国产乱码精品精不卡 | 国内偷自第一区二区三区 | 一本一本久久aa综合精品 | 成人精品在线观看 | 草碰在线视频 | 国产第6页 | 九九精品视频在线 | 国产人伦精品一区二区三区 | 国产日韩在线视看第一页 | 久久精品视频91 | 国产一区二区三区四区成男人 | 在线视频91 | 久久人人爽爽爽人久久久 | 婷婷国产v国产偷v亚洲高清 | 国产一级揄自揄精品视频 | 狠狠综合欧美综合欧美色 | 色xx综合网 | 国产精品久久国产三级国不卡顿 | 亚洲乱码卡一卡二卡新区中国 | 久久强奷乱码老熟女 | 玩弄了裸睡少妇人妻野战 | 99国精品午夜福利视频不卡 | 亚洲欧美精品在线 | 国产va精品午夜福利视频 | 中文成人精品久久一区 | 色又黄又爽18禁免费视频 | 久草视频资源 | 久久亚洲精品成人av二次元 | 亚洲欲色欲www怡红院 | 日韩一区二区在线看 | 久久电影网午夜鲁丝片免费 | 亚洲色综合 | 依人在线视频 | 婷婷色婷婷开心五月四房播播久久 | xxx国产老太婆视频 免费中文熟妇在线影片 | 日本一区二区在线不卡 | 欧美激情一区二区三区在线 | 国产乱淫a∨片免费观看 | 蜜桃视频在线观看免费视频网站www | 国内精品久久久久久中文字幕 | 免费无码h肉动漫在线观看 中日韩无砖码一线二线 | 日韩精品tv | 成人a v视频在线观看 | 国产精品一区饥渴老女人 | 国产97人人超碰caoprom | 亚洲精品在线观看视频 | 我爱avav色av爱avav亚洲 | 粉嫩粉嫩一区性色av片 | 日本高清视频一区 | 国产亚洲精品久久久久久无几年桃 | 日本亚洲欧洲免费无线码 | 91蜜桃传媒精品久久久一区二区 | 久久久久久久久久久久久女过产乱 | 亚洲精品国产品国语在线 |