黑人一区二区 I 污黄网站在线观看 I 影音先锋va I 在线免费色视频 I 国产老头和老头xxxx× I 色综久久 I 欧美三级 欧美一级 I 日本色电影 I 狼人久草 I 大黑人交xxx极品hd I 啊灬快c我灬啊灬用力灬啊灬 I 97干在线 I 天堂视频免费看 I 国产极品美女高潮无套嗷嗷叫酒店 I 欧美尻逼 I 中文有码在线 I 贝利弗山的秘密在线观看 I 国产97在线 | 亚洲 I 亚洲三级理论 I 免费的av网站 I 亚洲又粗又长 I 黄色shi I 久久精品国产精品亚洲红杏 I 亚洲在线www I 成人动漫在线一区 I 美腿一区 I 先锋资源站av I 久久久久免费网 I 99爱国产精品 I 99精品国产一区二区电影 I 日本国产欧美在线n677.cc I 国产男女色诱视频在线播放 I 免费国产va在线观看 I 国产农村黄aaaaa特黄av毛片 I 国产极品模特精品一二 I 免费毛片黄片 I 色戒在线免费观看 I 日日鲁鲁 I 中文字幕无码乱人妻

Welcome to visit Hnchairman Industrial Intelligent System Official website!

Cases

position:Home > Cases

Coke oven heating intelligent control system

Release date:2020-01-08 Source:This site Views:3335
  I. Project introduction and construction

  The intelligent control system of coke oven heating is designed for the 5.5m stamp charging coke oven. The system aims to save gas, stabilize coke quality and facilitate manual operation. Through intelligent control of coke oven heating process and coordination of four car interlocking system, the coking production process is comprehensively and intelligently controlled.

  The scope of the project includes the production site of the coke oven, from the main body of the coke oven to fixed facilities such as gas pipelines, flues, risers, and smoke separation ducts, as well as four vehicles (coal loading vehicles, coke pushing vehicles, coke quenching vehicles, coke blocking vehicles), Mechanical facilities such as switches. The manageable objects include the main body of the coke oven and various gas pipes, flues, and four-car equipment; the materials include heating gas, air, coke cake, exhaust gas, and waste gas.

  uilding progress:

  Hunan Qianmeng Industrial Intelligent System Co., Ltd. has signed the contract on May 3, 2018 and completed the acceptance on October 6, 2018.

  Second, the implementation plan

 The project is divided into various sub-systems for implementation, including the stand-fire flame temperature measurement system, the riser temperature measurement system, the gas single-pipe automatic transformation system, and the four-car interlocking system implementation plan

  1.Construction of temperature measurement system for vertical fire tunnel


Figure 21 Overall layout of full and semi-installed infrared temperature measurement in vertical fire tunnel

  The installation of 1 # furnace infrared thermometer in the figure above is a schematic diagram of the full installation of the thermometer. There are 4 control cabinets on the coke side and the machine side of the furnace end table and the furnace table. There are 102 temperature measurement points in each furnace. (For example, 51 thermometers on the focal side, "machine control cabinet 1" is connected to nearly 26, and "machine control cabinet 3" is close to 25, and the machine side is similar). At the same time, the air source or nitrogen source is connected to the furnace table and the end table. The air source needs to be equipped with 2 sets of air filters on the coke side, a total of 4 sets of air filters. The air source and nitrogen source can be automatically switched. Backside infrared thermometer.

  The backflushing gas is mainly nitrogen, and clean and dry instrument wind is used as a backup. Manual remote switching is implemented according to the needs of the site to ensure that the backflushing system has continuous wind.

  The DN50 gas pipe interface needs to be connected near the coke oven, with a flanged stop valve, and an air storage tank location (1000mm in diameter and 2500mm in height) is reserved. Air source pressure is not less than 0.8Mpa. The air volume is about 40m3 / h.

  (1) Partial installation drawing
Figure 22 Installation layout of the infrared thermometer in the fire tunnel

  (2) Site construction drawing

  Host computer interface

  Figure 23 Average temperature, change trend, and statistical table

  Hardware physical map
Figure 24 Demonstration diagram of temperature measurement point installation
Figure 25 Demonstration diagram of infrared thermometer fiber
Figure 26 Infrared thermometer control cabinet

  2. Construction of temperature measurement system for riser

  1) Overall installation layout
Figure 27 Overall layout of riser thermocouple installation

  The machine control cabinet is arranged in the furnace room to connect all thermocouples; the machine control cabinet is connected to the central control cabinet of the central control room through the DP bus.

  2) Partial installation drawing

  Installed near the bridge pipe connection, the temperature of the waste gas is lower than that of the riser pipe, which can prolong the life of the thermocouple, save materials and facilitate installation.
Figure 28 Schematic diagram of the thermocouple component mounting part (near the bridge tube connection)

  3) Site construction drawing

  ? Host computer interface
Figure 29 Trend of crude gas temperature with coking time

  Site physical map
Figure 30 Demonstration point 2—Bridge tube

  3.Automated reconstruction of single gas pipe

  1) Overall installation layout
Figure 33 Overall installation layout of coke oven gas single tube reconstruction

  2) Reconstruction diagram

  There is a short joint between the single tube orifice plate box and the addition and subtraction of the Cork for transformation. The workload is small, and the existing single tube structure will not be changed.

  The control center sends a signal to the positioner, the positioner works to connect the air source, and the opening degree of the butterfly valve is adjusted to a suitable position by a pneumatic actuator (if there is no air source and no electricity, the manual mechanism can be adjusted manually To adjust the butterfly valve opening). When the opening degree of the butterfly valve is adjusted to the specified position, the positioner cuts off the power and keeps the butterfly valve in this position. Then the signal is transmitted to the control center, so as to realize the automatic adjustment of the single tube.

  The modified sealing device is also a sealing device using the existing pipeline.

Fig. 32 Schematic diagram of coke oven gas single tube transformation-(short section modification)


Figure 33 Structure of the regulating valve


Figure 34 Overall bird's eye view

  The position of the bridge can be in the upper or lower part, the specific position is subject to the scene.
Figure 34 Pneumatic actuator pneumatic circuit diagram

  The gas path is arranged such that the center of the furnace body is divided into two gas path headers, and then a pneumatic regulating butterfly valve connected to each single tube through a pipe joint and a gas tube.

  2) Site construction drawings

  Host computer interface
Figure 34 single tube optimization control interface

  The interface includes a single hole fire fall time abnormal prompt, an oven time reminder, a vertical fire tunnel temperature abnormal prompt, a single tube adjustment automatic means switch, and exchange signal display.

  ? Hardware physical map

  Figure a before transformation Figure b after transformation
Figure 35 Site effect diagram of single tube reconstruction-(short section reconstruction)

  4.Four-car interlocking system

  Host computer interface

Figure 31 Real-time monitoring diagram of four-vehicle interlocking system


Figure 32 Focusing plan

  The four-car interlocking system can provide coke oven coke push and coal loading data for coke oven heating. The coke oven heating system analyzes coke oven time and adjusts the demand for coke oven gas. The stroke of the coke rod is conducive to the temperature measurement of the coke cake to determine the temperature of each position of the coke cake. The temperature of the coke cake is helpful to deduce the corresponding heating situation of the vertical fire tunnel. The system can be upgraded to increase the unit of coke pusher and coke quencher, which is convenient for the management of coke oven production.

 Third, the technical route

  The system includes a data acquisition subsystem, a gas supervisor automatic adjustment subsystem, a flue gas suction automatic adjustment subsystem, a gas collection process intelligent control subsystem, and a four-car interlocking subsystem. The system framework is shown in the figure:
Figure 1 system structure diagram

  The system uses industrial network environmental protection detection system, laboratory system, dcs system and other third-party systems in the factory for data exchange; and installs online collection equipment data, mainly including straight-line temperature, flue gas exhaust gas oxygen content zirconia, rising tube Gas temperature, opening degree of single pipe control valve, etc.

  After the intelligent calculation center comprehensively analyzes the data, it intelligently adjusts the set value of the gas main, the set value of the suction of the flue gas, the opening degree of the single-pipe regulating valve, and optimizes the standard temperature to ensure stable and uniform temperature in the coking process. The intelligent computing center communicates with the DCS system to achieve data sharing and bumpless switching.

  4. Project achievements, implementation results and experience summary

  Project achievements and implementation results

  After the project is put into use, it meets environmental protection production, and the workload of temperature regulation and temperature measurement is significantly reduced, and the gas saving effect is obvious. The specific effects are as follows:

  1. Under the condition of the same gas calorific value, standard temperature and coal blending level, the gas can be saved by about 5% through the main pipe control.

  2. Under normal production conditions such as no clogging of the coke oven gas pipeline, stable gas flow meter, normal regulating valve, and sufficient gas pressure, the average temperature of the whole furnace is ± 7 ° C.

  3. Reduce nitrogen oxides by about 30% under normal operating conditions.

  Lessons learned:

  Coking intelligent manufacturing projects, based on automated equipment, add the necessary online sensing, and through working condition analysis and pre-judgment, the focus is on adaptive control to meet on-site working condition changes, and automatic accumulation of knowledge base to achieve coking production. Intelligence and management intelligence.
0730-8206860
主站蜘蛛池模板: 又黄又爽又色的视频 | 国产成人午夜福利在线小电影 | 欧美全黄| 天天操比| 午夜a理论片在线播放 | 日韩、欧美、亚洲综合在线 | 国产少妇高潮在线观看 | 不卡av免费看 | 人人看人人插 | 搡老熟女国产 | 91在线导航| 国产高潮视频在线观看 | 国产精品嫩草影院精东 | 97国产大学生情侣白嫩酒店 | 国产精品网红尤物福利在线观看 | 国产又粗又黄 | 老司机亚洲精品 | 国产99久9在线视频 | 传媒 | 久久久久人妻精品一区 | 成人国产区| 亚洲精品区午夜亚洲精品区 | 国产美女精品视频免费播放软件 | 国产精品久久久久精女同 | 天天曰夜夜操 | 亚洲色欲啪啪久久www综合网 | av播播 | 日韩中文字幕欧美 | 成人免费精品动漫网站 | 99久久精品精品6精品精品 | 亚洲欧洲美洲在线观看 | 女人和拘做爰正片视频 | 久久久久久久久久网 | 亚洲永久精品在线观看 | 伊人色在线 | 国产精品揄拍一区二区久久国内亚洲精 | 国产日韩精品一区二区 | 不卡的av在线播放 | 欧美日本一 | 99热国产| 久久精品人妻中文系列 | 免费无码又爽又刺激高潮 | 天天躁日日躁aaaaxxxx | 亚洲中文字幕久在线 | 欧洲一卡2卡三卡4卡免费视频 | 欧美激情专区 | 国产在线视精品在一区二区 | 国产日韩欧美在线播放 | 国产视频网站在线观看 | 夜夜夜夜夜夜av夜夜夜夜 | 日韩av卡一卡二 | 91灌醉下药在线观看播放 | 国产精品a国产精品a手机版 | 日韩精品一区二区午夜成人版 | 四虎国产精品永久在线无码 | 天天看片天天av免费观看 | 国产精品毛片一区二区 | 传媒av在线| 4hu四虎永久在线影院的剧情介绍 | 91精品国产91久久久久久三级 | 亚洲精品一区国产 | 国产av天堂无码一区二区三区 | 图片区小说区亚洲 | 久久久无码人妻精品无码 | 2018天天操 | 久久中文字幕网 | 精品日韩欧美一区二区在线播放 | 欧美裸体摔跤xxxx | 中文字幕在线好乱1234 | 国产良家自拍 | 福利视频一区二区 | 国产又黄又爽又猛免费视频播放 | 国产精品欧美亚洲 | 亚洲视频综合网 | 人善性zzzzzo另类 | 思思久久精品 | 91最新视频 | 五月丁色 | 国产精品久久久久久久久久免费看 | 全国最大成人免费视频 | 一本大道卡一卡二卡三乱码全集资源 | jjzz日本女人 | 久久精品国产99久久久小说 | 亚洲综合欧美在线一区在线播放 | 狠狠88综合久久久久综合网 | 中文字幕av一区二区五区 | 亚洲春色综合另类网 | 国产中老年妇女精品 | 午夜亚洲乱码伦小说区69堂 | 国产成人一区二区三区小说 | 女女同性一区二区三区免费观看 | 娇妻被黑人粗大高潮白浆 | 日日爽夜夜操 | 人人cao | 亚洲日本在线在线看片4k超清 | 中文屏幕乱码av | 婷婷色六月天 | 日韩免费在线观看av | 国产情侣av在线 | 欧美极品少妇xxx |